A build log of the Frigate Diana by Occre. Parts of the build have been modified to increase level of detail and to be more faithful to the original vessel.
17 December 2010
Upper deck fitting
The upper deck is now installed in place. Since I left its installation to this stage, it had to be split in two before fitting.
No comments:
Post a Comment